Indicative 2026 ocean freight ranges by machine class and destination — RoRo, flat rack and container, transit times, cost factors and export documents.
| Machine class | West Africa | East Africa | SE Asia | Middle East |
|---|---|---|---|---|
| Mini excavator 1.8–6 t | $1,800–3,500 | $1,500–2,800 | $900–1,800 | $1,000–2,000 |
| Small excavator 7–13 t | $2,500–4,000 | $2,000–3,200 | $1,200–2,200 | $1,400–2,600 |
| Medium excavator 14–21 t | $3,000–5,000 | $2,600–4,200 | $1,800–3,000 | $2,000–3,400 |
| Large excavator 22–33 t | $4,500–8,000 | $3,800–6,500 | $2,600–4,500 | $2,800–5,000 |
| Wheel loader | $2,800–5,000 | $2,400–4,200 | $1,600–2,800 | $1,800–3,200 |
| Forklift 2–5 t | $1,500–3,000 | $1,300–2,400 | $800–1,600 | $900–1,800 |
| Dump truck / truck crane | $3,500–6,500 | $3,000–5,500 | $2,200–4,000 | $2,400–4,500 |
Best for self-propelled machines — driven on and off scheduled carriers, lowest cost per unit. Not for non-running units.
Craned on board. Required for non-running machines, oversized units and mixed cargo. Costs more, handles any condition.
For mini excavators and forklifts. Can consolidate spare parts in the same container.
| Destination | Port | Transit |
|---|---|---|
| West Africa | Lagos / Tema / Abidjan | 35–45 days |
| East Africa | Mombasa / Dar es Salaam | 28–38 days |
| Southeast Asia | Manila / Ho Chi Minh City / Jakarta | 7–18 days |
| Middle East | Jebel Ali / Dammam | 15–25 days |
| Central Asia | Rail to Almaty / Tashkent | 18–30 days |
Mini $1,800–3,500 · small $2,500–4,000 · medium $3,000–5,000 · large $4,500–8,000 (2026 indicative, port-to-port).
RoRo for running machines (cheapest); flat rack for non-running or oversized units.
Commercial invoice, packing list, bill of lading, export declaration; destinations like Nigeria (SONCAP) and Kenya (PVoC) also require pre-shipment inspection certificates.
Inland haulage in China, origin THC, destination THC, customs duty and VAT, clearing fees, delivery to site.
All figures are indicative 2026 ranges observed on the market and change with vessel schedules and fuel adjustments. Request a quote for a firm price per machine and destination port.
Indicative ocean freight ranges for used excavators, loaders, forklifts and trucks shipped from Chinese ports — by machine class and destination, with shipping methods, transit times, cost factors and export documents.
Indicative 2026 ranges · updated by HUDA Machinery export teamOcean freight is quoted port-to-port in USD and depends on the machine's size and weight, the service type and the destination port. The table below reflects indicative ranges observed on the market in 2026 for RoRo or flat rack shipments of a single machine.
| Machine class | Typical weight | West Africa (Lagos / Tema) | East Africa (Mombasa / Dar es Salaam) | SE Asia (Manila / HCMC / Jakarta) | Middle East (Jebel Ali) |
|---|---|---|---|---|---|
| Mini excavator 1.8–6 t | 1.5–6 t | $1,800–3,500 | $1,500–2,800 | $900–1,800 | $1,000–2,000 |
| Small excavator 7–13 t | 6–13 t | $2,500–4,000 | $2,000–3,200 | $1,200–2,200 | $1,400–2,600 |
| Medium excavator 14–21 t | 13–21 t | $3,000–5,000 | $2,600–4,200 | $1,800–3,000 | $2,000–3,400 |
| Large excavator 22–33 t | 21–33 t | $4,500–8,000 | $3,800–6,500 | $2,600–4,500 | $2,800–5,000 |
| Wheel loader | 5–19 t | $2,800–5,000 | $2,400–4,200 | $1,600–2,800 | $1,800–3,200 |
| Forklift 2–5 t | 3–7 t | $1,500–3,000 | $1,300–2,400 | $800–1,600 | $900–1,800 |
| Dump truck / truck crane | 12–30 t | $3,500–6,500 | $3,000–5,500 | $2,200–4,000 | $2,400–4,500 |
Port-to-port only. Inland haulage in China, origin port handling (THC) and marine insurance are quoted separately. Non-running machines and oversized cargo move on flat rack or breakbulk terms at different rates.
Best for self-propelled machines: the unit is driven on and off scheduled car-and- machinery carriers. RoRo is usually the cheapest way to move a running excavator, loader or truck, with fixed sailing schedules from major Chinese ports.
The unit is craned on board as loose cargo. Required for non-running machines, oversized units and mixed cargo, and flexible on dimensions. Costs more than RoRo and is booked per sailing.
Mini excavators and forklifts fit in a 20 ft or 40 ft flat-rack or open-top container, and spare parts can be consolidated in the same box. Limited by machine dimensions and crane capacity at both ports.
| Destination | Common ports | Port-to-port transit |
|---|---|---|
| West Africa | Lagos, Tema, Abidjan, Dakar | 35–45 days |
| East Africa | Mombasa, Dar es Salaam | 28–38 days |
| Southeast Asia | Manila, Ho Chi Minh City, Jakarta | 7–18 days |
| Middle East | Jebel Ali, Dammam | 15–25 days |
| Central Asia | Rail to Almaty, Tashkent | 18–30 days |
Transit times exclude port waiting and customs clearing at destination. Vessel schedules change monthly; confirm the current sailing when you request a quote.
Every HUDA Machinery shipment ships with the standard Chinese export document set: commercial invoice, packing list, bill of lading and export customs declaration. Depending on the destination, used machinery may also require a pre-shipment inspection certificate — for example SONCAP for Nigeria or PVoC for Kenya. We prepare the export documents and guide buyers through destination-country requirements before the vessel sails.
Indicative 2026 port-to-port freight to Lagos or Tema: $1,800–3,500 for a mini excavator (1.8–6 t), $2,500–4,000 for a small excavator (7–13 t), $3,000–5,000 for a medium excavator (14–21 t) and $4,500–8,000 for a large excavator (22–33 t). Request a quote for a firm price — actual rates vary with vessel schedules, fuel adjustments and season.
RoRo is usually cheapest for self-propelled machines: the unit is driven on and off scheduled carriers. Flat rack or breakbulk is required for non-running machines, oversized units and mixed cargo — it costs more but handles any condition and size.
Typical port-to-port transit to Lagos or Tema is 35–45 days depending on the route and vessel schedule. East Africa takes about 28–38 days, Southeast Asia 7–18 days and the Middle East 15–25 days.
Commercial invoice, packing list, bill of lading and Chinese export customs declaration. Destination countries may also require a pre-shipment inspection certificate — for example SONCAP for Nigeria and PVoC for Kenya.
Inland haulage to the Chinese port, origin port handling (THC), marine insurance if required, and at destination: destination THC, customs duty and VAT, customs clearing fees and delivery to the final site.
Yes. We quote freight per machine and destination and ship FOB, CFR or CIF from Chinese ports. Every quotation lists the machine price and freight separately so you can compare.